Aerospace
First article inspection documentation has to be produced for many characteristics per part, retained for long periods, and defended during customer and authority audits.
Turn model PMI or 2D drawing information into numbered inspection characteristics, balloons and FAI report data. Keep design requirements and inspection records connected through the same characteristic numbers.